Call PH +632-7360356 or US +1-714-5983474

    ARCA South – Ayala Land’s New Business and Lifestyle District in the City of Taguig

    ARCA South – Flash forward to new ways of living in an emerging central business and lifestyle district

    ARCA South transforms FTI into Taguig's newest CBD. An Ayala Land project.Refreshing the former Food Terminal Inc. (FTI) in Taguig, ARCA South integrates Ayala Land’s best estate practices in a visionary destination south of the metro. Masterplanned for access, variety, and efficiency, 74 hectares bring together contemporary conveniences and unparalleled connectivity to the city. In a destination attuned with easy, effortless lifestyles, Alveo Land synchronizes you, your home, your city – soon.

    Putting together years of experience and knowledge, Ayala Land will build the former FTI property from the ground up with best practices learned in several decades of building central business districts.

    Ayala Land's ARCA South. Main Street.

    Ayala Land's ARCA South in Taguig. An P80 Billion, 5-year plan to build, 870000 sqm gross floor area.

     

     

    Location

    Ayala Land's ARCA South in Taguig. Location Map.

     

    Scale Comparison of Business District

    Ayala Land’s trademark central business districts in Metro Manila are all multi-hectare developments built over several decades and years. ARCA South at 74 Hectares is just second to the size of Makati and is almost twice the size of Bonifacio Global City.

    Makati CBD – 90 Hectares
    ARCA South – 74 Hectares
    Bonifacio Global City – 39.7 Hectares
    Madrigal Business Park – 27.3 Hectares

    ARCA South compared to Makati and BGC

     

    Development Program

    Ayala Land's ARCA South in Taguig. Development Program.

     

    In-City Campus Development

    Structures inside ARCA South are at the midrise level. Helping craft a distinctly urban and modern community but without the towering heights and constrictive feel of a high-rise CBD. An integrated 3-level parking basement covers 40% of ARCA South promoting a highly pedestrianized environment with vehicular traffic pushed below ground.

    Taguig - ARCA South's basement parking covers 40% of the development.

     

     

     

    An aggressive 870,000 sqm gross floor area target in 5 years with an P80 Billion investment.

    Phase 1 – Offices – 200,000 sqm gross floor area for office developments. 9 office buildings will be built with the first 2 buildings completed in 2017. Ideal for single-tenant locators.

    Ayala Land's ARCA South in Taguig. Phase 1 plan for 9 office buildings.

     

    Phase 1 – Retail – 250,000 sqm gross floor area completed by 2019 with a Lifestyle Mall, Regional Mall and a Transit-Oriented Mall.

    Ayala Land's ARCA South in Taguig. Phase 1 plan for 250,000 sqm GFA of retail space.

    Ayala Land's ARCA South in Taguig. Phase 1 plan for 250,000 sqm GFA of retail space. Dining Terraces.

    Location

    4.7 kms from Ninoy Aquino International Airport
    5 kms from Bonifacio Global City
    7 kms from Makati CBD

    ARCA South features a C5 & C6 connector road project that will give the development its own exit and a quick link to Makati.
    An Intermodal Transport System with a projected volume of 4,000 buses and 200,000 commuters per day.

    Ayala Land's ARCA South in Taguig. Connector road to C5 & C6.

    Ayala Land's ARCA South in Taguig. Connector roads to C5.

     

    Residential Options in ARCA South

    ARBOR LANES (Ayala Land Premier)

    Arbor Lanes

    1-Bedroom Classic Units 2-Bedroom Grand Units 3-Bedroom Classic Units

     

    THE VERANDA (Alveo Land)

    The Veranda, ARCA South. Alveo Land's first development in the mixed-use development in the former FTI Complex.

    Studio Units 1-Bedroom Units 2-Bedroom Units 3-Bedroom Units

     

    AVIDA TOWERS ONE UNION PLACE (Avida Land)

    Avida Towers One Union Place at ARCA South

    Studio Units 1-Bedroom Units 2-Bedroom Units

     

    All images, drawings and unit layouts in this material are conceptual and intended to give a general idea of the project, and maybe subject to change.

     

     

     

    Google+